Good Corrosion-Resistant Stainless Steel Temporary Bridge

Escala: Puente Medio
Uso: Pasarela, Puente de carretera, Puente sobre el agua, Puente ferroviario, Viaduct
grado de acero: s355/ s460/gr 55c/gr350/gr50/gr65/gb355/460
capacidad de carga: hl93/ha+20hb/t44/clase a/b/mlc110/db24
anchura del recorrido del carro: 3,15m estándar /4,2m ew/7,35m carriles dobles
alias de modelo: cb200/zb200/compact-200

Products Details

  • Visión General
  • Product Description
  • Company Profile
  • Our Advantages
  • Certifications
  • After Sales Service
  • Our Customers
  • FAQ
Visión General

Información Básica.

No. de Modelo.
HD200/CB200/ZB200/Compact-200
duración máxima
60,96m para un carril/45,72m para dos carriles
galvanizado en caliente
iso1461/as/nzs 4680/astm-a123/bs1706 o equivalente
pintura
kit de epoxi a largo plazo rico en zinc o alkyd k temporal
Paquete de Transporte
Transported by Container/Truck in Strong Packing
Especificación
Panel dimension 3.048m*2.134m
Marca Comercial
Great Wall & Evercross
Origen
Zhenjiang
Código del HS
7308100000
Capacidad de Producción
100, 000 Tons

Descripción de Producto

Product Description
 

The HD200 bailey bridge is similar to the HD100 bailey bridge and 321-Type panel bridge from their appearance. The difference is its increased panel height to 2.134m. For some bridge with longer spans, lt employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve-fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts,which increase the usage life of the bolts and ensure the safety of panel bridges. Sway Brace is made of integral type and connected with the transom to improve the overall stability of the assembled steel bridge. The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15,HS-20,HS-25,HL-93 and pedrail-50 etc.

Good Corrosion-Resistant Stainless Steel Temporary Bridge


  Compact200 Bailey bridge 
SECTION PROPERTIES(ONE TRUSS)

CONST. SECTION PROPERTIES
SECTION AREA OF CHORD BENDING FACTOR MOMENT OF INTERTIA
(cm2) (cm3) (cm4)
SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392
 

ALLOWABLE STRESS OF PANEL
Material yield strength of panel σS=345MPa
Material allowable stress [σ]=0.8×σS=276 MPa
Allowable bearing stress [N]= [σ]×F×φ=276×2548×0.751=528kN=54t
Stability factor of chord  SSφSS=0.751;DS φDS=0.897
Allowable moment of panel [M]= [N]×h=528×2.134=1127kN·m=115t·m

 

Compact-200 Bailey bridge Truss Allowable Internal Force Table(Half-bridge)

 Allowable Internal Force  Allowable Bending Moment[M]
(kN·m)

 
Allowable Shears force[Q]
(kN)

 
High-shears Union Allowable Shears Force [Q]H
(kN)

 
        Configuration                           
SS SS 1127 257 348
SSR 2254 257 348
DS DS 2525 514 696
DSR1 3381 514 696
DSR2 5050 514 696
TS TS 3800 771 1044
TSR2 5635 771 1044
TSR3 7600 771 1044
QS QS 5050 1028 1392
QSR3 7889 1028 1392
QSR4 10100 1028 1392
   Good Corrosion-Resistant Stainless Steel Temporary Bridge
Good Corrosion-Resistant Stainless Steel Temporary Bridge
Good Corrosion-Resistant Stainless Steel Temporary Bridge
 
Company Profile
Good Corrosion-Resistant Stainless Steel Temporary Bridge
Our Advantages
Good Corrosion-Resistant Stainless Steel Temporary Bridge
Good Corrosion-Resistant Stainless Steel Temporary Bridge
Good Corrosion-Resistant Stainless Steel Temporary Bridge
Certifications
Good Corrosion-Resistant Stainless Steel Temporary BridgeGood Corrosion-Resistant Stainless Steel Temporary Bridge
After Sales Service

Good Corrosion-Resistant Stainless Steel Temporary Bridge
Good Corrosion-Resistant Stainless Steel Temporary Bridge

Our Customers
Good Corrosion-Resistant Stainless Steel Temporary Bridge
FAQ
Good Corrosion-Resistant Stainless Steel Temporary Bridge
Q: Which countries do you export to?
A: Our company's products have been exported to dozens of countries and regions. Including: Nepal, Cambodia, Laos, Vietnam, Malaysia, Myanmar, Philippines, Ecuador, Colombia, Barbados, Trinidad and Tobago, Dominica, Papua New Guinea, Solomon Islands, Kenya, Tanzania, Zambia, Congo, Tajikistan, Georgia, etc.

Q: Are you a factory or a trade company ?
A: We are an industry and trade company. The factory covers an area of 47,000 square meters, the production workshop is 22,000 square meters, and the office area is 5,000 square meters. It has 12 production lines of Bailey Bridge, various steel Bridges and various steel structure products, with a lifting capacity of 100 tons. Annual output is more than 50,000 tons. The company has its own import and export rights, with 20 years of export business experience.

Q: Do you accept custom processing?
A: Our company has an efficient and flexible technical team, we can process custom-made a variety of non-standard Bailey bridge, steel bridge, steel structure.

Q: Can your company meet American standards?
A: Yes, our products not only meet the AASHTO American standard, but also meet the British BS5400, Australia AS5100 and other international standards.

Q: Which airport is the nearest to your company? Can I visit your company anytime?
A: The nearest airports are Nanjing Lukou International Airport and Shanghai Pudong International Airport. You can visit our company  anytime, our company will issue an invitation letter and arrange to pick you up according to your needs. Your transportation and accommodation during your visit to our company will be arranged by our company.

Q: Could you send me some hard copies of your catalogues?
A: Sure. Please send us your address and contact information and we will send it to you by international express as soon as possible.

Q: Can we be your agent or distributor?
A: Our company is recruiting powerful partners all over the world for common development and win-win . Look forward to long-term cooperation with you!

Q:How soon can I receive your reply after I send you my inquiry?
A: We will give professional and technical feedback within 6 hours after receiving your inquiry . After communicate the technical parameters,we will provide quotation and preliminary design within 24 hours.

Contáctenos

No dude en enviarnos su consulta en el siguiente formulario. Le responderemos en 24 horas.